Skip to content

Method

From exposure to durable control.

Control cycle / 05

A five-stage method connects discovery, analysis, architecture, implementation, and validation without turning security into a one-off report.

Gate 1

01 — Discover

Establish business context, critical assets, threat assumptions, existing controls, and evidence quality.

Gate 2

02 — Analyze

Trace attack paths, dependencies, trust boundaries, failure modes, and control gaps.

Gate 3

03 — Design

Define the target state, tradeoffs, priorities, ownership, and measurable acceptance criteria.

Gate 4

04 — Implement

Integrate controls in safe phases with operational documentation and knowledge transfer.

Gate 5

05 — Validate

Test effectiveness, close findings, measure coverage, and feed lessons back into the program.

Next decision

Turn the next unknown into an engineering decision.

Send consultation request ↗